Construction of disease control centre
Construction of disease control centre at Kiruhura District Scope includes: Administration block Laboratory block Conference block VET store Accommodation blocks (10) Medium Voltage reticulation Step down substation Sub consultant to CAILEC: for Electrical, Voice and data, CCTV, Fire detection and Alarm, etc. Make material lists...
Continue Reading
Construction of Joint Medical Stores (JMS)
2023- 2024 Construction of Joint Medical Stores (JMS) branch at Gulu City: Scope includes: -Extension of 11kv Line - Installation of 200kva Transformer -Cable reticulation -Installation of steel tanks (2No) - Installation of Fire pump set - Installation of Voice & data - Installation of...